Job Title: Document Controller
Working Location: Vung Tau/ Other
Project: Detailed Engineering For KNT Field
Job Purpose:
– Assist Project team in document/drawing management
General Description:
Directly reporting to QA/QC Lead Engineer with the major responsibilities as followings:
– To set up and manage Project Document Control System.
– To provide a proficient and effective document control service for the assigned Project team, to ensure that Project goals are achieved.
– To effectively manage and process all incoming and outgoing Project documentation using the Company Documentation System (SPF) in accordance with procedures.
– Accurately maintain archives and databases for Project documentation using in house document management system and Project specific spreadsheets/databases.
– Collect, issue, receive and distribute incoming and outgoing Project documentation within pre-agreed timeframes.
– Generate and issue Project document status reports on a regular and timely basis.
– Maintain Project Master Document List in accordance with Company Documentation System requirements and Project requirements.
– Responsible for carrying out other documentation tasks and administrative activities as required by Project or as directed by Functional Leader.
– Participate in and be the mentor for R&EI-VSP on-job training program.
– Implementing other assignments as required by Project Manager/ Engineering Manager/ QA/QC Lead Engineer.
Qualifications and Work Experience required:
Qualification
– Bachelor Degree or higher in Engineering or Business Administration.
Experience & Requirements
The job holder should have the following:
– A minimum 05 years of experience in document management of Oil & Gas major projects.
– A minimum 03 years as Document Controller with controlled document management in
Engineering, Projects or Manufacturing environment.
– Experience in the use of formalized document control processes and tools.
– Knowledge of documentation workflow, understand the processes involved.
– To set up and manage Project Document Control System.
– To provide a proficient and effective document control service for the assigned Project team, to ensure that Project goals are achieved.
– Be fully aware of the implication of errors in document management.
– Working knowledge of IT aspects of document management in addition to competency in MS
office applications (Word, Excel, PowerPoint, Outlook)
– Good understanding of written and spoken English.
– Ability to work in team environment.
Challenges (If any):
– Multi-functional, and able to cope with diverse job demands.
– Coordinating work in multiple locations with different organization and multiple interfaces.
– Under pressure and workload